Project Completion Certificate (Ground Water)
Scheme ID: 20075302 Name of Scheme: Malakpur & Patei Nasir W/S Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3640 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Aug-2024 Actual Date of Completion (Capex): 19-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.06 Mtr/ 105.84 M Malakpur & Patei Nasir 28.305001 78.385111
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 48.6 cum / 48 M Malakpur & Patei Nasir 28.305001 78.385111
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 225 KL/ 16 M Malakpur & Patei Nasir 28.315032 79.374197
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 125 0.268
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.294
2 HDPE Pipe PN-6: Class PE-100 75 0.368
3 HDPE Pipe PN-6: Class PE-100 63 4.9595
4 HDPE Pipe PN-6: Class PE-100 110 0.235
5 HDPE Pipe PN-6: Class PE-100 140 2.265
6 HDPE Pipe PN-6: Class PE-100 160 0.177
7 HDPE Pipe PN-6: Class PE-100 200 0.192
HSC Connection
Sno. Total Nos.
1 470
Other Details
2.35
2.21
2.21
20-Sep-2025
20-Dec-2025