Project Completion Certificate (Ground Water)
Scheme ID: 20076609 Name of Scheme: NAGWA GP WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1867 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Sep-2024 Actual Date of Completion (Capex): 18-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 150 NAGAWA 27.233653 82.967785
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 350 LPM / 43 MTR NAGAWA 27.233653 82.967785
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 100KL 12 MTR NAGAWA 27.233653 82.967785
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 / DI PIPE 100 0.3560
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE-100 PN-6 / HDPE PIPE 140 0.093
2 PE-100 PN-6 / HDPE PIPE 110 0.425
3 PE-100 PN-6 / HDPE PIPE 75 0.439
4 PE-100 PN-6 / HDPE PIPE 63 3.819
5 PE-100 PN-6 / HDPE PIPE 90 0.334
HSC Connection
Sno. Total Nos.
1 258
Other Details
1.62
1.62
1.58
18-Jul-2025
29-Oct-2025