| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076874 | Name of Scheme: GUTHINA SVS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3345 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 02-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.02M/101.38M | GUTHINA | 27.36038 | 79.33248 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 750LPM/63M | GUTHINA | 27.36038 | 79.33248 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL/16M | GUTHINA | 27.36038 | 79.33248 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.041 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 1.002 | |
| 2 | HDPE PIPE | 63 | 4.892 | |
| 3 | HDPE PIPE | 110 | 0.149 | |
| 4 | HDPE PIPE | 140 | 0.112 | |
| 5 | HDPE PIPE | 160 | 0.684 | |
| 6 | HDPE PIPE | 180 | 0.104 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 571 |