Project Completion Certificate (Ground Water)
Scheme ID: 20076897 Name of Scheme: SIKANDARPUR AGU SVS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2825 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 21-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22M/94.42M SIKANDARPUR AGU 27.64309 79.14550
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 600LPM/61M SIKANDARPUR AGU 27.64309 79.14550
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/14M SIKANDARPUR AGU 27.64309 79.14550
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0239
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.809
2 HDPE 63 6.693
3 HDPE 110 0.009
4 HDPE 140 1.451
5 HDPE 160 0.844
HSC Connection
Sno. Total Nos.
1 552
Other Details
2.66
2.59
2.66
21-Jun-2024
22-Jun-2024