| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077041 | Name of Scheme: BACHHOR RO W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1851 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 0.0 | BACHHOR | 29.165872 | 77.180057 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 150 LMP/62M | BACHHOR | 29.165963 | 77.180092 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/10 | BACHHOR | 29.165963 | 77.180092 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 80 | 0.0 | |
| 2 | K7 | 200 | 0.0 | |
| 3 | K7 | 150 | 0.0 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0 | |
| 2 | HDPE | 75 | 0.2225 | |
| 3 | HDPE | 63 | 2.0879 | |
| 4 | HDPE | 160 | 0 | |
| 5 | HDPE | 125 | 0 | |
| 6 | HDPE | 110 | 0.2590 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 268 |