Project Completion Certificate (Ground Water)
Scheme ID: 20077092 Name of Scheme: BHAU KHURD GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 1698 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 16-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.45/95.80 BHAU KHURD 27.08802 79.86873
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 400/72 BHAU KHURD 27.08802 79.86873
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/20 BHAU KHURD 27.08802 79.86873
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 Clear Water Rising Main
2 DI 100 0.01720 Clear Water Rising Main
3 DI 150 0.00530 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.71 Distribution Network
2 HDPE 63 2.123 Distribution Network
3 HDPE 110 0.211 Distribution Network
4 HDPE 140 0.898 Distribution Network
5 HDPE 160 0.294 Distribution Network
6 HDPE 180 0.981 Distribution Network
HSC Connection
Sno. Total Nos.
1 256
Other Details
2.16
2.16
2.16
19-Jul-2024
20-Jul-2024