Project Completion Certificate (Ground Water)
Scheme ID: 20077264 Name of Scheme: Bikarampur No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 1331 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Feb-2024 Actual Date of Completion (Capex): 25-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15/118.33 BIKARAMPUR 26.484073 80.055627
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 300/59 BIKARAMPUR 26.484073 80.055627
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75/12 BIKARAMPUR 26.484073 80.055627
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0231
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.844
2 HDPE 90 1.339
3 HDPE 110 0.472
4 HDPE 125 0.556
5 HDPE 140 0.735
HSC Connection
Sno. Total Nos.
1 407
Other Details
2.09
0.00
1.71
09-May-2024
10-May-2024