Project Completion Certificate (Ground Water)
Scheme ID: 20077464 Name of Scheme: LALPUR AKBARPUR NAURANGABAD No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2278 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 09-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELLS 24/227.33 LALPUR AKBARPUR 26.467027 79.963245
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 600/70 LALPUR AKBARPUR 26.467027 79.963245
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 LALPUR AKBARPUR 26.467027 79.963245
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.01455
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.103
2 HDPE 90 3.004
3 HDPE 110 0.533
4 HDPE 140 0.230
5 HDPE 160 1.138
HSC Connection
Sno. Total Nos.
1 530
Other Details
3.08
0.00
3.18
25-Mar-2024
26-Mar-2024