Project Completion Certificate (Ground Water)
Scheme ID: 20077567 Name of Scheme: nasar kheda & sandupur No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2410 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Apr-2024 Actual Date of Completion (Capex): 24-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.10/177.31 NASARKHEDA & SANDHUPUR 26.555266 79.555266
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.01380
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 125 1.675
2 HDPE 63 4.232
3 HDPE 90 3.337
4 HDPE 140 0.653
5 HDPE 110 0.357
HSC Connection
Sno. Total Nos.
1 488
Other Details
3.19
0.00
2.60
24-Aug-2024
25-Aug-2024