| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20078306 | Name of Scheme: BHANDPURA SV GP W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 7494 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Feb-2024 | Actual Date of Completion (Capex): 01-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 33.00/91.49 | Bhandpura | 28.708219 | 79.074304 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC Pump | 63/44 | Bhandpura | 28.708219 | 79.074304 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 325/14 | Bhandpura | 28.708352 | 79.074385 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 125 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.71 | |
| 2 | HDPE | 75 | 0.435 | |
| 3 | HDPE | 63 | 6.986 | |
| 4 | HDPE | 110 | 1.036 | |
| 5 | HDPE | 125 | 1.162 | |
| 6 | HDPE | 160 | 0.0211 | |
| 7 | HDPE | 180 | 0.0312 | |
| 8 | HDPE | 200 | 0.0146 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 799 |