Project Completion Certificate (Ground Water)
Scheme ID: 20078955 Name of Scheme: SIHAULI VILLAGE WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 13
Total Population Covered: 4680 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Mar-2023 Actual Date of Completion (Capex): 26-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 18m/64m Sihauli 25.634547 82.909176
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 675 LPM/44M Sihauli 25.634547 82.909176
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200kl/14m Sihauli 25.634502 82.90887
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI,K-7 125 0.0254 yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.985 yes
2 HDPE 75 7.718 yes
3 HDPE 63 12.779 yes
4 HDPE 110 0.159 yes
5 HDPE 125 0.169 yes
6 HDPE 140 0.014 yes
7 HDPE 160 0.437 yes
HSC Connection
Sno. Total Nos.
1 471
Other Details
271.87
234.19
234.19
26-Feb-2025
27-Feb-2025