Project Completion Certificate (Ground Water)
Scheme ID: 20080048 Name of Scheme: GAIDABRA RO W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2444 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 31-Dec-2027
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28/92.10 GAIDBARA 29.204193 77.437144
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 190/ LPM/70 M GAIDBARA 29.204193 77.437144
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/18 GAIDBARA 29.204031 77.437072
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 80 0.031
2 K7 200 0.0
3 K7 150 0.0
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.567
2 HDPE 75 0.0
3 HDPE 63 5.095
4 HDPE 140 0.0
5 HDPE 125 0.0728
6 HDPE 110 0.0826
HSC Connection
Sno. Total Nos.
1 455
Other Details
1.12
1.12
1.14
31-Dec-2024
01-Jan-2025