Project Completion Certificate (Ground Water)
Scheme ID: 20080062 Name of Scheme: FATEPUR CHCK RO W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1898 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 31-Dec-2027
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/81.10 FATEHPUR CHAK 29.207503 77.301453
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 150LPM/63M FATEHPUR CHAK 29.207503 77.301453
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50KL/12M FATEHPUR CHAK 29.207452 77.301462
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 80 0.0187
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.4584
2 HDPE 63 2.3156
3 HDPE 180 0.0
4 HDPE 160 0.0
5 HDPE 140 0.0
6 HDPE 125 0.0492
HSC Connection
Sno. Total Nos.
1 190
Other Details
0.81
0.81
0.78
31-Dec-2025
01-Jan-2026