Project Completion Certificate (Ground Water)
Scheme ID: 20080094 Name of Scheme: GANGNAULI RO W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5684 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 31-Dec-2027
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 0.0 GANGNAULI 29.206783 77.332492
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 430/65 GANGNAULI 29.206783 77.33228
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/12 GANGNAULI 29.206783 77.33228
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 200 0.0
2 K7 150 0.0
3 K7 100 0.0
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.3709
2 HDPE 75 0.0
3 HDPE 63 8.3016
4 HDPE 160 0.0
5 HDPE 140 0.572
6 HDPE 110 0.3579
HSC Connection
Sno. Total Nos.
1 934
Other Details
1.57
1.57
1.60
31-Dec-2025
01-Jan-2026