| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20080094 | Name of Scheme: GANGNAULI RO W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 5684 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2025 | Actual Date of Completion (Capex): 31-Dec-2027 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 0.0 | GANGNAULI | 29.206783 | 77.332492 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 430/65 | GANGNAULI | 29.206783 | 77.33228 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/12 | GANGNAULI | 29.206783 | 77.33228 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 200 | 0.0 | |
| 2 | K7 | 150 | 0.0 | |
| 3 | K7 | 100 | 0.0 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.3709 | |
| 2 | HDPE | 75 | 0.0 | |
| 3 | HDPE | 63 | 8.3016 | |
| 4 | HDPE | 160 | 0.0 | |
| 5 | HDPE | 140 | 0.572 | |
| 6 | HDPE | 110 | 0.3579 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 934 |