| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20081393 | Name of Scheme: SAMAICHIPUR MAJRA ATHURIYA & UMMARAPUR MVS | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2362 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 20-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27 Mtr./140.35 Mtr. | SAMAICHIPUR MAJRA ATHURIYA | 27.43698 | 79.36492 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersibel Pump | 900 LPM/63 Mtr. | SAMAICHIPUR MAJRA ATHURIYA | 27.43698 | 79.36492 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250KL/16M | SAMAICHIPUR MAJRA ATHURIYA | 27.43698 | 79.36492 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.769 | |
| 2 | HDPE | 63 | 8.193 | |
| 3 | HDPE | 110 | 0.905 | |
| 4 | HDPE | 140 | 1.026 | |
| 5 | HDPE | 160 | 0.263 | |
| 6 | HDPE | 180 | 0.892 | |
| 7 | HDPE | 200 | 0.211 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 775 |