Project Completion Certificate (Ground Water)
Scheme ID: 20082705 Name of Scheme: BHAINA MAU JJM No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4560 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Feb-2024 Actual Date of Completion (Capex): 08-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30M/111M BHAINA MAU 27.28919 80.189284
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.94 M³ per Min /41Mtr BHAINA MAU 27.28919 80.189284
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275KL/ 12 Mtr BHAINA MAU 27.289262 80.188935
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.01868
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.389
2 HDPE Pipe PN-6, Class PE-100 75 3.035
3 HDPE Pipe PN-6, Class PE-100 90 1.346
4 HDPE Pipe PN-6, Class PE-100 110 2.291
5 HDPE Pipe PN-6, Class PE-100 125 0.804
6 HDPE Pipe PN-6, Class PE-100 140 2.232
7 HDPE Pipe PN-6, Class PE-100 160 0.057
8 HDPE Pipe PN-6, Class PE-100 200 0.085
HSC Connection
Sno. Total Nos.
1 559
Other Details
3.04
0.00
3.03
07-Apr-2024
26-Sep-2025