Project Completion Certificate (Ground Water)
Scheme ID: 20084174 Name of Scheme: BALEHRA KAMAL NAGAR JJM No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 1870 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2023 Actual Date of Completion (Capex): 07-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 09/47 BALEHRA KAMAL NAGAR 27.023973 80.060383
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 400/41 BALEHRA KAMAL NAGAR 27.023973 80.060383
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 BALEHRA KAMAL NAGAR 27.02393 80.060376
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 75 2112
2 HDPE 90 2363
3 HDPE 110 1409
4 HDPE 63 917
5 HDPE 125 111
6 HDPE 140 14
HSC Connection
Sno. Total Nos.
1 345
Other Details
1.71
0.00
1.70
06-Jul-2024
26-Sep-2025