| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084487 | Name of Scheme: KONP GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2080 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 10-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.00/90.57 | KONP | 28.103455 | 80.014659 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP - 1 | 28.38 M3 / 45 M | KONP | 28.103455 | 80.014659 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL - 12 M | KONP | 28.103465 | 80.014645 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6 KG | 63 | 2.793 | |
| 2 | HDPE / 6 KG | 75 | 0.899 | |
| 3 | HDPE / 6 KG | 90 | 1.722 | |
| 4 | HDPE / 6 KG | 110 | 0.558 | |
| 5 | HDPE / 6 KG | 140 | 0.610 | |
| 6 | HDPE / 6 KG | 160 | 0.989 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 367 |