Project Completion Certificate (Ground Water)
Scheme ID: 20085499 Name of Scheme: SADHINAVA JJM No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4310 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 10-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27M/116M SADHINAVA 27.544665 80.101532
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 54M³ per Hr / 43M SADHINAVA 27.544665 80.101532
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/14M SADHINAVA 27.544665 80.101532
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.049
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.184
2 HDPE PIPE PN:-6 75 5.464
3 HDPE PIPE PN:-6 90 2.113
4 HDPE PIPE PN:-6 110 2.712
5 HDPE PIPE PN:-6 125 1.067
6 HDPE PIPE PN:-6 140 0.511
7 HDPE PIPE PN:-6 160 0.895
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.081
HSC Connection
Sno. Total Nos.
1 800
Other Details
3.31
0.00
3.17
09-Aug-2025
20-Feb-2026