Project Completion Certificate (Ground Water)
Scheme ID: 20085663 Name of Scheme: GUNGWACHH&KAMASIN MATHIYA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 20
Total Population Covered: 4688 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 21-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26/117.31 GUNGWACHH 26.144530 81.890576
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 980 LPM/ 54 M GUNGWACHH 26.144530 81.890576
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 300 KL/ 16 m GUNGWACHH 26.144530 81.890576
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 14.600
2 HDPE 90 5.748
3 HDPE 110 3.341
4 HDPE 140 1.865
5 HDPE 180 0.845
6 HDPE 200 1.143
HSC Connection
Sno. Total Nos.
1 665
Other Details
5.13
0.00
5.10
21-May-2025
22-Aug-2025