Project Completion Certificate (Ground Water)
Scheme ID: 20087003 Name of Scheme: IMAMUDDINPUR WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2340 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 01-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.03/78.3 IMAMUDDINPUR 26 º 27' 40.968" N 82º 56' 40.2252" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 23.4/42 IMAMUDDINPUR 26 º 27' 40.968" N 82º 56' 40.2252" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum 100/12 IMAMUDDINPUR 26 º 27' 40.968" N 82º 56' 40.2252" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 8.299
2 HDPE Pipe PN-6: Class PE-100 75 3.025
3 HDPE Pipe PN-6: Class PE-100 90 0.382
4 HDPE Pipe PN-6: Class PE-100 110 0.415
5 HDPE Pipe PN-6: Class PE-100 140 0.888
HSC Connection
Sno. Total Nos.
1 318
Other Details
1.64
0.00
0.00
14-Aug-2026
15-Aug-2026