Project Completion Certificate (Ground Water)
Scheme ID: 20087867 Name of Scheme: Buapur Nathu Viullage Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3287 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Oct-2025 Actual Date of Completion (Capex): 25-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WEELL 24.08m/126.14m Buapur Nathu 29.238097 78.509085
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.5 HP 640 LPM/44 M Buapur Nathu 29.238097 78.509085
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200kl/14m Buapur Nathu 29.238097 78.509085
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 63 4.90
2 HDPE PIPE PN-6: CLASS PE-100 75 0.22
3 HDPE PIPE PN-6: CLASS PE-100 90 0.76
4 HDPE PIPE PN-6: CLASS PE-100 110 0.74
5 HDPE PIPE PN-6: CLASS PE-100 125 0.12
HSC Connection
Sno. Total Nos.
1 620
Other Details
1.99
1.99
1.96
31-Oct-2025
01-Nov-2025