| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20087930 | Name of Scheme: Rooppur Sahar | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 3478 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Mar-2024 | Actual Date of Completion (Capex): 07-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.08M / 60.45 m | Rooppur Sahar | 26.772546 | 79.529887 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible | 750LPM/53M | Rooppur Sahar | 26.772546 | 79.529887 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL/16M | Rooppur Sahar | 26.772546 | 79.529887 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.01865 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.3065 | |
| 2 | HDPE | 90 | 2.9799 | |
| 3 | HDPE | 110 | 1.5415 | |
| 4 | HDPE | 125 | 0.807 | |
| 5 | HDPE | 140 | .7915 | |
| 6 | HDPE | 180 | 0.919 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 597 |