Project Completion Certificate (Ground Water)
Scheme ID: 20087930 Name of Scheme: Rooppur Sahar No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3478 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 07-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.08M / 60.45 m Rooppur Sahar 26.772546 79.529887
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 750LPM/53M Rooppur Sahar 26.772546 79.529887
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M Rooppur Sahar 26.772546 79.529887
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.01865
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.3065
2 HDPE 90 2.9799
3 HDPE 110 1.5415
4 HDPE 125 0.807
5 HDPE 140 .7915
6 HDPE 180 0.919
HSC Connection
Sno. Total Nos.
1 597
Other Details
2.93
0.00
2.93
06-Jun-2024
08-Jun-2024