Project Completion Certificate (Ground Water)
Scheme ID: 20088682 Name of Scheme: Madhawapur & marnai No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5738 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 16-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8289
2 HDPE 90 6006.5
3 HDPE 110 401
4 HDPE 125 615
5 HDPE 140 0
6 HDPE 180 1319
7 HDPE 200 1122
HSC Connection
Sno. Total Nos.
Other Details
4.79
0.00
0.00
15-Mar-2025
17-Mar-2025