Project Completion Certificate (Ground Water)
Scheme ID: 20089084 Name of Scheme: MAHOLIA BIRAN & BIJAURA BIJAURIA MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME No. of Villages: 7 No. of Habitation Covered: 7
Total Population Covered: 3090 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 24-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/94.30 MAHOLIA BIRAN & BIJAURA BIJAURIA 28.191316 80.172287
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 39.6/46 MAHOLIA BIRAN & BIJAURA BIJAURIA 28.191316 80.172287
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200/18 MAHOLIA BIRAN & BIJAURA BIJAURIA 28.191412 80.172402
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 33.372
2 HDPE/6KG 75 3.045
3 HDPE/6KG 90 1.856
4 HDPE/6KG 110 0.366
5 HDPE/6KG 140 4.218
6 HDPE/6KG 160 1.991
7 HDPE/6KG 200 0.165
HSC Connection
Sno. Total Nos.
1 566
Other Details
2.80
0.00
2.80
24-Apr-2024
06-Dec-2024