| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089146 | Name of Scheme: Aslatpur Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 4074 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 20-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube-well | 30.6/125.19 | Aslatpur Urf Tohfapur | 29.372318 | 78.421173 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 900/48 | Aslatpur Urf Tohfapur | 29.372318 | 78.421173 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/12 | Aslatpur Urf Tohfapur | 29.372318 | 78.421173 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.4022 | |
| 2 | HDPE | 75 | 0.9039 | |
| 3 | HDPE | 90 | 3.6954 | |
| 4 | HDPE | 110 | 0.1571 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 341 |