Project Completion Certificate (Ground Water)
Scheme ID: 20090114 Name of Scheme: ASEH GRAM PANCHAYAT WATER SUPPY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4095 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 03-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 14.32/72.18 ASEH "27.097158 " 79.595675
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 900/67 ASEH "27.097158 " 79.595675
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/20 ASEH "27.097158 " 79.595675
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0137 Clear Water Rising Main
2 DI 200 0.0051 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.028 Distribution Network
2 HDPE 63 7.216 Distribution Network
3 HDPE 110 2.63 Distribution Network
4 HDPE 125 0.466 Distribution Network
5 HDPE 140 0.331 Distribution Network
6 HDPE 160 0.191 Distribution Network
7 HDPE 200 2.687 Distribution Network
HSC Connection
Sno. Total Nos.
1 909
Other Details
4.69
4.63
4.68
07-Aug-2024
08-Aug-2024