Project Completion Certificate (Ground Water)
Scheme ID: 20090308 Name of Scheme: BHURPUR SALARPUR JALALPUR No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 4940 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 26-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 40.27 Mtr / 84.05 Mtr BHURPUR 29.011017 77.783891
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1050 LPM / 56 Mtr BHURPUR 29.011017 77.783891
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 18 M BHURPUR 29.011017 77.783891
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0233
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.817 Laying In Bhurpur Only
2 HDPE 90 1.217 Laying In Bhurpur Only
3 HDPE 110 0.5003 Laying In Bhurpur Only
HSC Connection
Sno. Total Nos.
1 316
Other Details
4.14
4.14
2.23
14-Apr-2025