| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091157 | Name of Scheme: Jaraon PWS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 1632 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Mar-2024 | Actual Date of Completion (Capex): 01-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | m/55.52m | Jaraon | 26.724637 | 79.619747 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible | 150LPM/49M | Jaraon | 26.724637 | 79.619747 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 50KL/12M | Jaraon | 26.724637 | 79.619747 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0153 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.46 | |
| 2 | HDPE | 90 | 2.493 | |
| 3 | HDPE | 125 | 2.396 | |
| 4 | HDPE | 140 | 0.535 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 301 |