Project Completion Certificate (Ground Water)
Scheme ID: 20091162 Name of Scheme: Fatehpur Karam & prayagpur & Karampur PWS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3761 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 09-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 30.02 M / 125.69 M FATEHPUR KARAM 26.49929 79.417463
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800 LPM / 53 M FATEHPUR KARAM 26.49929 79.417463
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 16 M FATEHPUR KARAM 26.49929 79.417463
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0109
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.429
2 HDPE 90 4.009
3 HDPE 110 1.065
4 HDPE 125 0.500
5 HDPE 140 0.395
6 HDPE 160 0.884
HSC Connection
Sno. Total Nos.
1 861
Other Details
3.16
0.00
3.26
08-Jun-2024
10-Jun-2024