Project Completion Certificate (Ground Water)
Scheme ID: 20091172 Name of Scheme: Bighepur PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1986 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 17-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18 M / 127.83 M BIGHEPUR 26.59965 79.370453
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 450 LPM / 59 M BIGHEPUR 26.59965 79.370453
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 12 M BIGHEPUR 26.59965 79.370453
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0136
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.1432
2 HDPE 90 1.4564
3 HDPE 110 0.234
4 HDPE 140 0.249
HSC Connection
Sno. Total Nos.
1 463
Other Details
1.88
0.00
1.86
16-Oct-2025
18-Oct-2025