| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091663 | Name of Scheme: BARNA BUJURG & WAHIDPUR MVS | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 4002 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 14-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24M/155.30M | BARNA BUJURG | 27.34987 | 79.57719 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 850LPM/65M | BARNA BUJURG | 27.34987 | 79.57719 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250KL/18M | BARNA BUJURG | 27.34987 | 79.57719 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.029 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 0.187 | |
| 2 | HDPE PIPE | 63 | 8.724 | |
| 3 | HDPE PIPE | 110 | 1.007 | |
| 4 | HDPE PIPE | 140 | 0.396 | |
| 5 | HDPE PIPE | 160 | 2.063 | |
| 6 | HDPE PIPE | 200 | 1.271 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 877 |