Project Completion Certificate (Ground Water)
Scheme ID: 20092014 Name of Scheme: KATRA RAHMAT KHAN SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3915 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2024 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26M/99.53M KATRA RAHMAT KHAN 27.55652 79.36385
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 800LPM/61M KATRA RAHMAT KHAN 27.55652 79.36385
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/14M KATRA RAHMAT KHAN 27.55652 79.36385
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.829
2 HDPE PIPE 63 5.667
3 HDPE PIPE 110 0.350
4 HDPE PIPE 140 0.535
5 HDPE PIPE 160 0.088
6 HDPE PIPE 180 0.332
HSC Connection
Sno. Total Nos.
1 721
Other Details
3.02
2.95
3.02
30-Jun-2024
01-Jul-2024