| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092217 | Name of Scheme: Navada gp water supply scheme | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2918 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 11-Jul-2024 | Actual Date of Completion (Capex): 07-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.03m/106m | Navada | 26.337176 | 84.115397 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 650LPM/49m | Navada | 26.337117 | 81.115383 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/16m staging | Navada | 26.337215 | 84.115545 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.040 | 40m |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 7.639 | |
| 2 | HDPE PIPE | 75 | 1.416 | |
| 3 | HDPE PIPE | 90 | 0.961 | |
| 4 | HDPE PIPE | 110 | 1.107 | |
| 5 | HDPE PIPE | 125 | .912 | |
| 6 | HDPE PIPE | 140 | 0.200 | |
| 7 | HDPE PIPE | 160 | 0.316 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 491 |