Project Completion Certificate (Ground Water)
Scheme ID: 20092402 Name of Scheme: BILHA MVS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2966 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 05-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05M/136.33m BILHA 27.61788 79.23164
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 650LPM/59M BILHA 27.61788 79.23164
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/12M BILHA 27.61788 79.23164
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.665
2 HDPE 63 8.639
3 HDPE 110 1.900
4 HDPE 140 0.348
5 HDPE 160 0.178
6 HDPE 180 0.045
HSC Connection
Sno. Total Nos.
1 499
Other Details
3.15
3.07
3.10
20-May-2024
21-May-2024