Project Completion Certificate (Ground Water)
Scheme ID: 20092639 Name of Scheme: MAHMADPUR AMLAIYA & MEDASYAM PUR MVS No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 4333 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 24-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22M/93.25M MAHMADPUR AMLAIYA 27.27108 79.55923
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 950LPM/63M MAHMADPUR AMLAIYA 27.27108 79.55923
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/16M MAHMADPUR AMLAIYA 27.27108 79.55923
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.205
2 HDPE PIPE 63 8.334
3 HDPE PIPE 110 1.124
4 HDPE PIPE 140 1.108
5 HDPE PIPE 160 0.477
6 HDPE PIPE 200 0.440
HSC Connection
Sno. Total Nos.
1 827
Other Details
4.22
4.12
4.19
24-Jun-2024
25-Jun-2024