Project Completion Certificate (Ground Water)
Scheme ID: 20092678 Name of Scheme: KIYAMPUR Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 6
Total Population Covered: 3750 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-May-2023 Actual Date of Completion (Capex): 10-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 30.12 M/ 68.33 M Kiyampur 26.397257 83.036775
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 780LPM/42M Kiyampur 26.397257 83.036775
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 225KL/12MTR Kiyampur 26.397257 83.036775
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2.071
2 HDPE Pipe PN-6: Class PE-100 75 3.197
3 HDPE Pipe PN-6: Class PE-100 63 14.540
4 HDPE Pipe PN-6: Class PE-100 110 1.204
5 HDPE Pipe PN-6: Class PE-100 140 2.431
6 HDPE Pipe PN-6: Class PE-100 160 0.185
7 HDPE Pipe PN-6: Class PE-100 200 0.028
HSC Connection
Sno. Total Nos.
1 300
Other Details
3.12
3.11
3.11
28-Feb-2026
01-Mar-2026