| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092722 | Name of Scheme: SHIBRAIMATH MVS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2634 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 01-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21M/114.50M | SHIBRAIMATH | 27.50793 | 79.31665 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 600LPM/61M | SHIBRAIMATH | 27.50793 | 79.31665 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL/14M | SHIBRAIMATH | 27.50793 | 79.31665 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 0.715 | |
| 2 | HDPE PIPE | 63 | 4.664 | |
| 3 | HDPE PIPE | 110 | 0.382 | |
| 4 | HDPE PIPE | 140 | 1.363 | |
| 5 | HDPE PIPE | 160 | 0.796 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |