| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092924 | Name of Scheme: TENDWA UJAR PAKHARPUR (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2050 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Jun-2024 | Actual Date of Completion (Capex): 14-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.20/270.3 | Tedwa Ujjar | 27.373512 | 81.527092 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 0.40cum/min / 45m | Tedwa Ujjar | 27.373512 | 81.527092 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank | 125KL/12M | Tedwa Ujjar | 27.373512 | 81.527092 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K9/DI | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN6/HDPE | 63 | 6.355 | |
| 2 | PN6/HDPE | 75 | 0.858 | |
| 3 | PN6/HDPE | 90 | 0.581 | |
| 4 | PN6/HDPE | 110 | 0.588 | |
| 5 | PN6/HDPE | 160 | 0.469 | |
| 6 | PN6/HDPE | 200 | 0.165 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 275 |