Project Completion Certificate (Ground Water)
Scheme ID: 20093346 Name of Scheme: WAJEERPUR CHITTAURA (VPL) MVS PWS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Dec-2024 Actual Date of Completion (Capex): 10-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.2/251.8 Wajeerpur 28.618759 81.66253
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 39.01/45 Wajeerpur 28.618759 81.66253
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over head tank 175kl/12m Wajeerpur 28.618759 81.66253
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K9/DI 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN6/HDPE 63 6.532
2 PN6/ HDPE 75 0.965
3 PN6/HDPE 90 0.284
4 PN6/HDPE 110 0.479
5 PN6/ HDPE 160 0.311
HSC Connection
Sno. Total Nos.
1 320
Other Details
2.10
2.10
1.90
12-Feb-2026
10-Mar-2026