Project Completion Certificate (Ground Water)
Scheme ID: 20093493 Name of Scheme: ARMEE JJM No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3620 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 09-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24M/ 100.3M ARMEE 27.306387 80.347535
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.75 M³ per Min /45Mtr ARMEE 27.306387 80.347535
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/12M ARMEE 27.306401 80.347501
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01706
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.380
2 HDPE Pipe PN-6, Class PE-100 75 4.989
3 HDPE Pipe PN-6, Class PE-100 90 1.295
4 HDPE Pipe PN-6, Class PE-100 110 0.222
5 HDPE Pipe PN-6, Class PE-100 125 1.133
6 HDPE Pipe PN-6, Class PE-100 140 1.823
7 HDPE Pipe PN-6, Class PE-100 160 0.046
HSC Connection
Sno. Total Nos.
1 645
Other Details
2.69
0.00
2.68
08-Jan-2024
26-Sep-2025