Project Completion Certificate (Ground Water)
Scheme ID: 20093557 Name of Scheme: Ramnagar W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2029 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28/104.60 RAMNAGAR 29.022786 77.378586
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 400 LPM/61 M RAMNAGAR 29.022786 77.378586
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/10 RAMNAGAR 29.022782 77.378660
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 100 0.0255
2 K7 200 0.0042
3 K7 150 0.0049
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.1564
2 HDPE 75 0.4145
3 HDPE 63 3.1517
4 HDPE 160 0.0
5 HDPE 125 0.1662
6 HDPE 110 0.058
HSC Connection
Sno. Total Nos.
1 418
Other Details
1.38
1.51
1.51
31-Dec-2025
01-Jan-2026