Project Completion Certificate (Ground Water)
Scheme ID: 20093565 Name of Scheme: Soorajpur Mahanwa W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3287 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29/92 SOORAJPUR MEHENWA 28.94260 77.27481
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550 LPM/64 M SOORAJPUR MEHENWA 28.94260 77.27481
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 SOORAJPUR MEHENWA 28.942608 77.274821
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 100 0.0
2 K7 150 0.0325
3 K7 200 0.0008
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.0101
2 HDPE 75 0.3894
3 HDPE 63 4.4276
4 HDPE 160 0.0
5 HDPE 140 0.0
6 HDPE 125 0.1949
7 HDPE 110 0.9578
HSC Connection
Sno. Total Nos.
1 558
Other Details
1.81
1.83
1.83
31-Aug-2025
01-Sep-2025