Project Completion Certificate (Ground Water)
Scheme ID: 20093626 Name of Scheme: Abdulpur Mewla W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 441 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWLLE 21/114.15 ABDULLAPUR MEWLA 28.922874 77.354784
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 100 LPM/63 M ABDULLAPUR MEWLA 28.922874 77.354784
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 25/10 ABDULLAPUR MEWLA 28.922809 77.354951
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 100 0.0309
2 K7 200 0.0
3 K7 150 0.0067
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.0
2 HDPE 75 0.101
3 HDPE 63 2.544
4 HDPE 180 0.0
5 HDPE 140 0.0
6 HDPE 110 0.035
HSC Connection
Sno. Total Nos.
1 332
Other Details
1.09
1.13
1.13
31-Dec-2025
01-Jan-2026