Project Completion Certificate (Ground Water)
Scheme ID: 20093652 Name of Scheme: GOONGA KHERI RO W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1677 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 20-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 14/17 GOONGA KHERI 29.149354 77.294612
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 130/63 GOONGA KHERI 29.149354 77.294612
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 GOONGA KHERI 29.149354 77.294612
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 100 0.03930
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.6256
2 HDPE 75 0.0
3 HDPE 63 3.401
4 HDPE 125 0.0659
HSC Connection
Sno. Total Nos.
1 375
Other Details
1.04
1.04
1.01
31-Aug-2024
01-Sep-2024