Project Completion Certificate (Ground Water)
Scheme ID: 20093726 Name of Scheme: Bhadaura PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1448 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 21-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 9.07M / 67.25 M BHADAURA BIDHUNA 26.849398 79.669013
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 55 M BHADAURA BIDHUNA 26.849398 79.669013
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 18 M BHADAURA BIDHUNA 26.849398 79.669013
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0117
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.015
2 HDPE 90 0.831
3 HDPE 110 0.828
4 HDPE 140 0.131
HSC Connection
Sno. Total Nos.
1 432
Other Details
1.48
0.00
1.49
20-Nov-2024
22-Nov-2024