Project Completion Certificate (Ground Water)
Scheme ID: 20093727 Name of Scheme: Baraua PWS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1698 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 02-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 100.33 M / 6.03 M BARAUA 26.542934 79.498417
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 49 M BARAUA 26.542934 79.498417
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 12 M BARAUA 26.542934 79.498417
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.391
2 HDPE 90 1.522
3 HDPE 110 0.201
4 HDPE 125 0.179
HSC Connection
Sno. Total Nos.
1 424
Other Details
1.21
0.00
1.23
01-May-2025
02-May-2025