Project Completion Certificate (Ground Water)
Scheme ID: 20094191 Name of Scheme: ambiyapur , alwalpur No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 1873 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Apr-2024 Actual Date of Completion (Capex): 23-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.13/202.25 AMBIYAPUR 26.511174 79.833993
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500/62 AMBIYAPUR 26.511174 79.833993
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 AMBIYAPUR 26.511174 79.833993
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0085
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.685
2 HDPE 90 3.847
3 HDPE 110 0.873
4 HDPE 125 0.147
5 HDPE 140 0.370
HSC Connection
Sno. Total Nos.
1 444
Other Details
2.97
0.00
2.39
06-May-2024
07-May-2024