| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095595 | Name of Scheme: Tilaunchi | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2200 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 20-Mar-2023 | Actual Date of Completion (Capex): 21-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 8/66 | TILAUNCHI | 26.339198° | 80.0257° |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 550/65 | TILAUNCHI | 26.339198° | 80.0257° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | TILAUNCHI | 26.339198° | 80.0257° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 2.961 | |
| 2 | HDPE PIPE | 75 | 0.501 | |
| 3 | HDPE PIPE | 90 | 0.259 | |
| 4 | HDPE PIPE | 110 | 0.103 | |
| 5 | HDPE PIPE | 125 | 0.045 | |
| 6 | HDPE PIPE | 140 | 0.038 | |
| 7 | HDPE PIPE | 160 | 0.308 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |