| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20096825 | Name of Scheme: TILGADIYA BUJURG GP WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2260 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 13-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 150.11 | TILGADIYA BUZURG | 27.153198 | 82.643293 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 500LPM / 43 MTR | TILGADIYA BUZURG | 27.153194 | 82.643295 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 150KL/14MTR. | TILGADIYA BUZURG | 27.152871 | 82.643203 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 / DI | 100 | 0.05086 | 100MM DIA OF DI PIPE K-7 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PE - 100 PN - 6 / HDPE PIPE | 63 | 2.440 | |
| 2 | PE - 100 PN - 6 / HDPE PIPE | 75 | 0.184 | |
| 3 | PE - 100 PN - 6 / HDPE PIPE | 90 | 0.164 | |
| 4 | PE - 100 PN - 6 / HDPE PIPE | 110 | 0.661 | |
| 5 | PE - 100 PN - 6 / HDPE PIPE | 125 | 0.382 | |
| 6 | PE - 100 PN - 6 / HDPE PIPE | 140 | 0.174 | |
| 7 | PE - 100 PN - 6 / HDPE PIPE | 160 | 0.351 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 275 |